Magino Environmental Assessment Documents

Prodigy Gold Incorporated (Prodigy) is a wholly owned subsidiary of Argonaut Gold Incorporated (Argonaut) and holds 100 percent (%) of the land tenure that comprises the Magino property.  Both Argonaut and Prodigy are committed to operating in a safe, environmentally responsible, cost efficient manner, while honouring commitments to the communities where they operate. This commitment is grounded in their corporate culture and is operationalized through their corporate governance activities, community contributions, and their environment, health, and safety practices.

For more information on the Magino Gold project, please contact magino.permitting@argonautgold.com

Environmental Impact Statement

Magino Gold Project - English EIS Summary
Projet Magino Gold - Resume de L’Evaluation de L’Impact Environmental
Magino Gold Project - Table of Contents
Magino EIS Chapter Figures
Chapter 1 - Introduction, Purpose and Need
Chapter 2 - Approach to the Preparation of the EIS
Chapter 3 - Project Setting and Context
Chapter 4 - Existing Conditions
Chapter 5 - Alternatives Assessment
Chapter 6 - Project Description
Chapter 7 - Effects Assessment
Chapter 8 - Accidents, Malfunctions and Worker Safety
Chapter 9 - Effects of the Environment on the Project
Chapter 10 - Human Health
Chapter 11 - Cumulative effects
Chapter 12 - Aboriginal Engagement
Chapter 13 - Public Consultation
Chapter 14 - Benefits to Ontario and Canada
Chapter 15 - Additional Environmental Approvals
Chapter 16 - Summary and Conclusions
Appendix 1 - Guidelines
Appendix 2 - Table of Concordance
Appendix 3-1 - Record of Communication Government Agencies
Appendix 3-2 - Government Communication Materials
Appendix 4 - Acronyms
Appendix 5 - Global Glossary

Technical Supporting Documents

TSD 1 - Geotechnical and Geohydrologic Investigation
TSD 2 - Geochemical Assessment
TSD 3 - Suface Water Hydrology
TSD 4 - Hydrogeological Study and Groundwater Modelling
TSD 5 - Schedule 2 Assessment of Alternatives for Mine Waste Management
TSD 6 - Tailings and Mine Rock Management Facility and Overburden Stockpiles - Conceptual Design Report
TSD 7 - Site Water Balance and Quality
TSD 8 - Visual Impacts Analysis
TSD 9 - Meterology and Air Quality
TSD 10 - Climate Change
TSD 11 - Noise
TSD 12 - Vibration
TSD 13 - Light
TSD 14 - Human Health Risk Assessment
TSD 15 - Fish and Fish Habitat
TSD 15 - Fish and Fish Habitat Addendum
TSD 16 - Surface Water and Sediment Quality
TSD 16 - Surface Water and Sediment Quality Addendum
TSD 17 - Terrestrial Ecology Baseline
TSD 18 - Stage 1 Archeology Assessment
TSD 18 - Stage 1 Archeology Assessment Supplemental
TSD 18 - Stage 2 Archeology Report
TSD 19 - Preliminary Closure Plan
TSD 20-1 - Environmental Management System (EMS)
TSD 20-2 - Health and Safety Management Plan
TSD 20-3 - Conceptual Emergency Response and Spill Prevention
TSD 20-4 - Hazardous Substances Management Plan
TSD 20-5 - Waste Management Plan
TSD 20-6 - Construction Environmental Protection Plan
TSD 20-8 - Mine Material Management Plan
TSD 20-11 - Air Quality Management Plan
TSD 20-12 - Water Management Plan
TSD 20-13 - Environmental Monitoring Plan
TSD 20-14 - Draft Fish Habitat Compensation Plan